We still do not have dependable internet connections; I hope I can get his posted before I get cut off.
Recent progress:
1. The plumbing & electrical are roughed in.
2. All the floor covering are selected. Ditto on the cabinet hardware.
3. The sheetrock is on the ceiling. (We can soon have insulation back in the attic, which should improve the heating situation considerably- a "warm" prospect since it was 25 degrees this morning.)
Monday, October 20, 2008
Subscribe to:
Post Comments (Atom)



No comments:
Post a Comment